Contact us

Service Hotline:

13621550864

Kunshan Guangguan Equipment Technology Co., Ltd.

Contact: Mr. Huang

Mobile phone: 13621550864

Landline: 0512-57256878

Fax: 0512-57254546

Mailbox: dvsks2006@aliyun.com

Website: www.acdt.com.cn

Address: No. 27, Huayuan Road, Zhangpu Town, Kunshan City, Jiangsu Province

Current position: Index >> News >> Industry news

Points to note in the installation of clean room

2021-01-19
second

Points to note in the installation of clean room

1. When the equipment in the clean room enters the clean room, it should try to avoid damaging the internal facilities of the clean room. If it is impossible to avoid, measures should be taken to minimize the damage to the clean room. The air flow from the clean room to the isolation area is maintained. Sexual pressure or negative pressure, to avoid dust-free workshop equipment from affecting the popularity of clean air flow, leading to the requirements of the dust-free workshop can not produce the environment.


2. The dust-free workshop is a completely sealed environment, and the internal pressure should be controlled as much as possible, otherwise the pollution may penetrate the compartment and affect the surrounding dust-free workshop. The pressure in the isolation area of the dust-free workshop needs to be controlled to avoid giving it to the surrounding The dust-free workshop causes pressure, if only the dust-free workshop that passes through can enter the isolation area. Adhesive pads are recommended after entering the isolation area of the dust-free workshop to remove pollution from the shoes.


3. The dust-free workshop should establish a monitoring area to ensure that the pollution of the adjacent dust-free workshop can be detected.


4. When installing various power facilities in the dust-free workshop, such as electricity, water, air supply, and exhaust ducts, care should be taken to control the residues produced by these operations as much as possible to prevent them from affecting the air in the dust-free workshop. Impact, cleanliness pollution.


5. The purification equipment installed in the dust-free workshop should adopt the clean parameters that meet the requirements of the dust-free workshop, with low dust production and strong cleaning effect.


6. After the installation of the purification equipment is completed, the site should be tested, and the acceptance test after the completion of the * must be fully equipped with the conditions of a dust-free workshop.


Contact Us

Contact: Manager Huang


Contact number: 13621550864


Landline: 0512-57256878km


Website: www.acdt.com.cn


Address: No. 27, Huayuan Road, Zhangpu Town, Kunshan City, Jiangsu Province